Originally Posted by
splat
I'm doing a deck soon and want to go one step above ground due to roots on my big silver maple coming up out of the ground where the deck goes. Would love to do a slab but that ain't happening, so I'm thinking ultralite crete atop plywood on 12'' oc joists on piers. Anyone worked like that with ultralite?
Sounds hard. If you're only going 1 step above grade, put up some PT 2x8's and fill it with gravel to the bottom of your concrete slab. Pour regular concrete. Roots will have enough wiggle room with the gravel. Put in rebar. Add a vapor barrier if you feel like it
Sent from my Pixel 4 XL using Tapatalk