I was stoked to get up the hill and work on some re-routes, but when I saw the dirt still had moisture I dropped that plan and worked on drainage instead. It's usually rock hard with loose sand on top, so you can't work on it when dry. Was able to re-establish drains down about half of the trail. Will take a few more hours to finish it, so fingers crossed we get another storm soon. Trail has held up pretty well despite lack of maintenance. I filled in or widened the ruts as well. The trail we used to climb up was obliterated by the fire and subsequent storms so this trail will now be climbed and descended.
Drain to the right with a dirt roller to make sure water goes off the side
Before
After:
Removing material that had filled drains and using it to fill ruts instead
In a few spots where there is room to ride above the rut I opened up access to that rather than filling the rut.
More drains. Before:
After
![]()