
Originally Posted by
LeeLau
Pic 1 _ mudhole
Pic 2. PILE ROCKS HERE sign. But nobody did
Pic 3 Start adding to the rock pile while Sharon starts wallowing in the slop. The organic and mud on the trail bed first needed to get cleared away.
Almost 10 years of accumulation entails removing almost 40cms of organic
Pic 4 more mudholing
Pic 5 Drained the swamp by carting away the organic and contouring the trail so the ooze slimed away. Got to use some of the rock
Pic 6 Needed to excavate even more organic and mud. Not depicted in picture left I dug a hole to China to excavate almost 60cms of organic slop which drains nicely into the creek.
Excavating so much organic got us finally down to mineral soil
Pic 7 The mineral soil in the drain needed to be further dug away to establish the final drain to out slope the trail. Turns out we had enough "good" soil to not need all that rock.
Should do for another decade







This kind of graft is the most important. All the glamorous stuff (jumps/drops/features) everyone up for.
Sent from my SM-G973F using TGR Forums mobile app
i dont kare i carnt spell or youse punktuation properlee, im on a skiing forum
Bookmarks