Check Out Our Shop
Page 426 of 427 FirstFirst ... 421 422 423 424 425 426 427 LastLast
Results 10,626 to 10,650 of 10661

Thread: Home Remodel: Do, Don'ts, Advice

  1. #10626
    Join Date
    May 2009
    Location
    inpdx
    Posts
    21,201
    Quote Originally Posted by californiagrown View Post
    No design pro requires upfront payment... not a single one (i sub design pros as part of my day job).
    generally we work then bill, but we do ask for a decent retainer to start cuz we've gotten stiffed too

  2. #10627
    Join Date
    Oct 2005
    Location
    Tahoe-ish
    Posts
    3,357
    NV has a similar law WRT the max we can ask for up front. Many "contractors" ignore it and ask for more. If they have to buy a ton of materials immediately I can sort of see it, but you can bill for them the instant they hit the job site, so it's NBD. Anyone willing to take on that work should have enough reserves to float the cost for 2 weeks or more. CA has much laxer requirements for financial stability than NV, though.

    In any case, we can always lien your ass if you don't pay, so eventually we'll get what we're owed. Thus asking for a big deposit is just bad form.
    ride bikes, climb, ski, travel, cook, work to fund former, repeat.

  3. #10628
    Join Date
    Dec 2010
    Posts
    5,072
    Quote Originally Posted by ::: ::: View Post
    generally we work then bill, but we do ask for a decent retainer to start cuz we've gotten stiffed too
    IME that has only happened when the client has a history of not paying on time, and the consultant is re-starting work on a project for them. Never seen it done first thing, upfront, on a new project/new client.

  4. #10629
    Join Date
    Jan 2008
    Location
    truckee
    Posts
    24,834
    My understanding, after hiring multiple contractors over the decades, is that money up front means that the contractor doesn't have good credit with the suppliers.

  5. #10630
    Join Date
    Aug 2007
    Location
    At the beach
    Posts
    20,926
    I interviewed 5 contractors and have decided on a company with many great reviews and a estimated price of $450k for 750 sq ft of living space, 1 bdrm, 1.5 bath, full kitchen, W/D and 250 sq ft of Trex decking around two sides of it. Waiting for the contract. Estimated completion date June 2026. (rolls eyes) I will provide plenty of laughs for you heathens down the road.
    Never in U.S. history has the public chosen leadership this malevolent. The moral clarity of their decision is crystalline, particularly knowing how Trump will regard his slim margin as a “mandate” to do his worst. We’ve learned something about America that we didn’t know, or perhaps didn’t believe, and it’ll forever color our individual judgments of who and what we are.

  6. #10631
    Join Date
    Feb 2008
    Posts
    3,518
    Quote Originally Posted by liv2ski View Post
    I interviewed 5 contractors and have decided on a company with many great reviews and a estimated price of $450k for 750 sq ft of living space, 1 bdrm, 1.5 bath, full kitchen, W/D and 250 sq ft of Trex decking around two sides of it. Waiting for the contract. Estimated completion date June 2026. (rolls eyes) I will provide plenty of laughs for you heathens down the road.
    Looking forward to the mag discount if you/your daughter ever rents it out

  7. #10632
    Join Date
    Mar 2009
    Posts
    3,377
    Hope you fatten that budget by 50% and extended unforseen delays.

  8. #10633
    Join Date
    Aug 2007
    Location
    At the beach
    Posts
    20,926
    Here is hoping they don't bend me over like you would.
    Never in U.S. history has the public chosen leadership this malevolent. The moral clarity of their decision is crystalline, particularly knowing how Trump will regard his slim margin as a “mandate” to do his worst. We’ve learned something about America that we didn’t know, or perhaps didn’t believe, and it’ll forever color our individual judgments of who and what we are.

  9. #10634
    Join Date
    Jan 2010
    Location
    your vacation
    Posts
    5,000
    Quote Originally Posted by old goat View Post
    My understanding, after hiring multiple contractors over the decades, is that money up front means that the contractor doesn't have good credit with the suppliers.
    yeah this is spot on
    pretty much having credit and cash in the bank is what a customer wants in a contractor not sure how you actually prove that to a customer?? showing bank statments? I never have
    endless horror stories out there of people just dumping money and shelling it out to the contractor and nothing getting done

    on the other hand I usually get my first check once we get started depending on the job it could be anywhere from 10k to 100k

  10. #10635
    Join Date
    Jan 2008
    Location
    truckee
    Posts
    24,834
    With a local contractor and only one lumber yard in town, when I ordered something for an addition they asked who the contractor was and they told me they loved him. I suppose one could find out what supplier a contractor uses and ask.We're advised to ask for lien releases from suppliers before paying as the job proceeds. I don't know if that applies outside of CA.

  11. #10636
    Join Date
    Aug 2007
    Location
    At the beach
    Posts
    20,926
    Curious...one of the showers has a glass door and adjoining glass panel that has brackets the create a .25 inch gap that water can flow under. It was calked when installed but that shit always gets moldy. Is the not some type of clear plastic trim piece I could use rather than calk?
    Never in U.S. history has the public chosen leadership this malevolent. The moral clarity of their decision is crystalline, particularly knowing how Trump will regard his slim margin as a “mandate” to do his worst. We’ve learned something about America that we didn’t know, or perhaps didn’t believe, and it’ll forever color our individual judgments of who and what we are.

  12. #10637
    Join Date
    Jan 2008
    Location
    livin the dream
    Posts
    6,400
    Just buy the most expensive silicone bathroom caulk you can find. Like from a tile or plumbing supply store, not HD / Lowe’s.

    Caulking is probably one of the most true “you get what you pay for” items… A quality product will last 10 years without cracking / molding, a big box store product will last less than 2.


    Sent from my iPhone using Tapatalk
    Best Skier on the Mountain
    Self-Certified
    1992 - 2012
    Squaw Valley, USA

  13. #10638
    Join Date
    Sep 2007
    Location
    tetons
    Posts
    8,703
    Quote Originally Posted by nickwm21 View Post
    Just buy the most expensive silicone bathroom caulk you can find. Like from a tile or plumbing supply store, not HD / Lowe’s.

    Caulking is probably one of the most true “you get what you pay for” items… A quality product will last 10 years without cracking / molding, a big box store product will last less than 2.
    Thank you- that is the type of “worth their weight in gold” info I get from this community


    Sent from my iPad using Tapatalk
    skid luxury

  14. #10639
    Join Date
    Dec 2007
    Location
    base of the Bush
    Posts
    15,191
    Like Nick said, do not go cheap. Any sort of janky plastic trim will will trap water under, behind and or between and get moldy quickly.

    Not sure if this will link or not GE Supreme Silicone Kitchen and Bath Clear



    https://www.amazon.com/GE-Supreme-Si...435178858&th=1
    www.apriliaforum.com

    "If the road You followed brought you to this,of what use was the road"?

    "I have no idea what I am talking about but would be happy to share my biased opinions as fact on the matter. "
    Ottime

  15. #10640
    Join Date
    Aug 2007
    Location
    At the beach
    Posts
    20,926
    Thanks guys.
    Never in U.S. history has the public chosen leadership this malevolent. The moral clarity of their decision is crystalline, particularly knowing how Trump will regard his slim margin as a “mandate” to do his worst. We’ve learned something about America that we didn’t know, or perhaps didn’t believe, and it’ll forever color our individual judgments of who and what we are.

  16. #10641
    Join Date
    Nov 2002
    Posts
    9,574
    If it really is 1/4 gap that is questionable install. When the customer wants a floating panel, with get slope on the curb and a 1/8max gap and the water stays in the shower. They do make plastic sweeps for glass doors. You may be able to get one of those to work. They get nasty also, but you toss the and get a new one. Caulking is a bit of an art. I don't let anyone do it on my job except me and the painters.

  17. #10642
    Join Date
    Sep 2005
    Location
    Not in the PRB
    Posts
    34,559
    Asked this in the unthreadworthy question thread, but it might get more answers here.

    Anyone ever insulate their garage doors? Did it make a big difference? Cause problems?

    Got a couple of quotes for replacement of the non-insulated doors with insulated ones, but 2 doors is going to cost $2500 minimum, more than it seems worth it to do. DIY insulation kits are cheap and seem somewhat simple (depending on which type) but I have read that they might add too much weight to the door and wear out the motor. But some insulation kits, that are basically reflectix material, don't weigh more than 4-5 pounds, so hard to imagine that would mess up the operation of a spring/motor designed to lift a very heavy steel door. Right?
    "fuck off you asshat gaper shit for brains fucktard wanker." - Jesus Christ
    "She was tossing her bean salad with the vigor of a Drunken Pop princess so I walked out of the corner and said.... "need a hand?"" - Odin
    "everybody's got their hooks into you, fuck em....forge on motherfuckers, drag all those bitches across the goal line with you." - (not so) ill-advised strategy

  18. #10643
    Join Date
    Nov 2017
    Location
    Down on Electric Avenue
    Posts
    5,092
    Ive seen garage doors with 2 inch foam blueboard cut to size and attached somehow, glue or whatevs...prolly a bit tedious to do but cheap and simple.

  19. #10644
    Join Date
    Nov 2002
    Posts
    9,574
    Blueboard is R10. Those kits are usually R8. Assuming you have a standard panelized door, this kit is gonna be a cleaner install and Blueboard ain't that cheap. See how the door buck is finished against the garage door. That can be a big air infiltration area.

  20. #10645
    Join Date
    Jan 2008
    Location
    truckee
    Posts
    24,834
    I had no trouble finding a replacement sweep for the bottom of my frameless glass shower door. The original tore after a few years but mold was never a problem.

  21. #10646
    Join Date
    Oct 2007
    Posts
    13,574
    We have some Jeld-Wen French doors that apparently have lifetime warranty on weatherstripping. They came with the house, but when I finally figured out what company they were from and got the warranty info, I was pretty happy to find out that they'd send me all new weatherstripping to replace the old stuff for free. Definitely cut down on drafting.

  22. #10647
    Join Date
    Aug 2007
    Location
    At the beach
    Posts
    20,926
    "I had no trouble finding a replacement sweep for the bottom of my frameless glass shower door. The original tore after a few years but mold was never a problem"

    Not the door sweep but the panel beside it. I have it all cleaned up and the shower all scrubbed out. A few spots soaking in mold killer for a few hours before I caulk the fucker again.
    Never in U.S. history has the public chosen leadership this malevolent. The moral clarity of their decision is crystalline, particularly knowing how Trump will regard his slim margin as a “mandate” to do his worst. We’ve learned something about America that we didn’t know, or perhaps didn’t believe, and it’ll forever color our individual judgments of who and what we are.

  23. #10648
    Join Date
    Jan 2008
    Location
    truckee
    Posts
    24,834
    A sweep might still work. Possibly trimmed

  24. #10649
    Join Date
    Dec 2012
    Location
    I can still smell Poutine.
    Posts
    26,626
    I need to figure out dimmable LED conversion for my recessed cans. I see kits but im a little lost. I dont want to have to do any sheet rock work to replace the fixtures. They are buried up in there. Just screwing dimmable LED bulbs in the sockets isn't going to work, ive tried that already, with lots of flickering, an explided bulb, and lots of humming noises. Fortunately no fires so far. Is there a product that can handle pretty old cans and still be dimmable? Easy fix for one section was to put in a non-dimmer switch. But I want to go back to dimmable.

  25. #10650
    Join Date
    Dec 2006
    Location
    Back in Seattle
    Posts
    1,515
    You should be able to get there with dimmable bulbs and a led rated dimmer switch but might have to do some trial and error for a combo that works.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •