*spoiler alert: lots sweating and cursing involved !
Ive been working on this house for 2 years now all out of pocket. On this 3 week trip in August I solo framed the second floor and roof in prep for the plumber and electrician to get in and do their thing.
I've had people ask why I didn't attach the T111 sheathing to the framing before standing the walls... 2 reasons:
1). All the lumber in Hawaii is soaked in Borate which is basically a salt water brine solution to prevent termite damage and as result it weighs A LOT! These damn sheets of plywood were easy over 100 lbs so I could stand a wall by myself
2) there are straps that had to attach from the first floor framing to second floor and there was no way to get them under the sheathing even if I were to stand up with jacks...
Next trip in November will be solo drywall install... yaaaay!!!