Pump tracking https://uploads.tapatalk-cdn.com/201...343c9d5a81.jpg
Sent from my SM-G950U using Tapatalk
Printable View
Pump tracking https://uploads.tapatalk-cdn.com/201...343c9d5a81.jpg
Sent from my SM-G950U using Tapatalk
Attachment 239815
Slab, to dry-stacked rock wall, to dirt. Seven Summits trail, Rossland BC.
That's some beautiful work right there ^
I am kinda one of those guys, though. I will only do maintenance a couple hours a year on the trails i ride 95% of the time, but will put in 7-10 full dig days on trails an hour+ away from me that i only ride a handful of times per year haha. I kinda figure that there is someone else from up there that digs a bunch down by me and it all comes out in the wash haha.
Yeah, but even a couple hours is huge imo. Anything adds to cumulative good. I enjoy building, so it's not a big deal, but I'm not big on maintenance. That is where I'd like to see the guys riding the trails we've built to pitch in. That way we can keep going on the builds. The maint is a time suck, but needed.
some great work getting done in here, props to all the diggers and supporters!
Nice work on Seven Summits.
I’ll be riding that next week.
Sent from my iPhone using TGR Forums
[IMG]Attachment 240001[/IMG]
These are my Specialized riding gloves, safe to say I’ve done some trail work in these guys.
Sent from my iPhone using TGR Forums
Wrote this little piece about Gravity Logic. Yah I'm a fan
https://www.singletracks.com/blog/mt...-logic-part-2/https://uploads.tapatalk-cdn.com/201...45f7ae1322.jpghttps://uploads.tapatalk-cdn.com/201...9eea76e037.jpg
They undoubtedly build some amazing trails. That said, they've been hired to build a few around here that turned out to be rather disappointing. I suspect there were some constraints imposed on them by the client and kinda doubt it was what they would have chosen to build had they been given total creative freedom. Not exactly sure what my point even is other than "We've hired Gravity Logic..." doesn't guarantee you're going to get a Whistler-quality trail.
When an artist isn't given creative freedom, or is given a narrow directive, you can't expect them to produce a masterpiece. I would guess they were directed to make a specific type of trail, catering to a specific skill level, with specific contraints (width, max grade, length, etc.).
IMO, if you are going to pay a master builder to build you a trail, i think it would be best to give them a budget, a general trail type to build, and then let them have creative freedom.
I was told that the "resource constraints" you pointed to were a limiting factor. Not to get all corporate-speak or pass the buck but routing, post-build maintenance etc count for a lot and the Utah site-owner definitely didn't buy into that ( which is their prerogative)
Dan, are you referring to 'pay to play' private or is this state, county, blm, etc paying out of pocket? I can see a gov entity just getting it done and maybe enhancing with the next budget...or not.
Attachment 242599Attachment 242600Attachment 242601
Switchbacks suck, but they are necessary evil sometimes. Some backcountry machine built that will definitely not ride like flow trail in the Anaconda Pintlers that we built last summer. Curious to go back and ride it and see what kind of chunky bliss emerged after the winter.
Sent from my iPhone using TGR Forums
thats certainly part of it
i would add though that having the locals involved is a key ingredient as well, knowing the dirt, terrain, user group, and volunteer support is all just as important as wicked built trails
pro diggers cant know everything about everywhere, local knowledge is crucial to long term success imo
if they wont get used, maintained, or last then its just a waste of $, as many land managers are finding out...
been doing the normal routine at local park
Attachment 242921
water water water
Attachment 242920
the crew doing their thing
Attachment 242922
pumptracks got pressure washed and getting seal coated tomorrow
Attachment 242923
not a bad little park overall
Attachment 242924
Slowly growing the local Primitive Trail Network.
Had our CBMBA Overnight trail building event last weekend. Reroute of 403 on the Washington Gulch trailhead side. Moved the trail off parts of private land and fully onto public lands. 90 people came out Saturday and 35 remained through Sunday to put in 1 mile of new trail.
Attachment 242977
Before
Attachment 242978
After
Attachment 242979
Also big thanks to TGR for the article about CBMBA's Conservation Corps efforts.
https://www.tetongravity.com/feature...weat-and-gears
Various projects we're working on around Rossland.
Attachment 243114
Attachment 243115Attachment 243116Attachment 243117
Nice rock work on that first shot.
You guys and gals up in BC do such nice work on trails, be it riding or hiking. Wish we could get that kind of work done down here in the states without the constant bickering of who is going to maintain it and needing to do all sorts of EIS, mind you the motorized trails and logging/mining/development industry have no problem putting a dozer blade to a hillside without much thought.
Nice Koots
I have been enjoying the fruits of your labor. It is very much appreciated.
Thanks
Sent from my iPhone using TGR Forums