Thanks for the info. We don't intend to move much/any plumbing electrical. I mean, an outlet may need to get moved or a showerhead may need a slightly different placement (guessing), but overall our intent is to keep the existing bones/layout of our bathrooms and kitchen, And we do have forced air heat so there is already ductwork in place.
No way I try to GC this, even if I had the time (I don't). I know my limitations and I need someone with skills, experience, and contacts.
As for a list of things to have done, it obviously depends on cost. Some items are on the wish list but may get scratched.
- Bathrooms need complete remodel, so new vanity, toilet, tub/shower, etc. But how high quality we go depends on cost.
- Kitchen at a minimum needs new cabinets, counters, sink, lighting, and while the flooring is fine (tile), we'll need new flooring after this is all done. Wish list includes knocking down the wall between the kitchen and living room making one giant open floor plan. Wish list also includes taking out the door to the back yard and putting in french doors.
- Central AC
- Exterior Paint (some siding needs repair)
- Sprinkler system (not expecting the GC to handle this)
- Convert garage back into a garage (it was ghetto/un-permitted converted to a guest bedroom sometime before I bought the house)
- Add a wall making second living room into a bedroom