Originally Posted by
Todd Zander
Been a fun couple of weeks with the Classic and mdf. Made it a stepless via teflon tape, but still sticking with whole number grinds until I decide to start experimenting.
Built a needle valved pressure gauge and dialed back the OPV to just under 10, and lastly decided to PID it with an auber kit w/ steam control. Definitely considering a 1/4" copper preheating circuit between the pump and boiler...cost all of $20.
Really glad I went this route as its been a fun learning process. Total cost including all the necessary accessories was around a grand, should last quite some time.